Short answer: The Pou Herenga Tai – Twin Coast Cycle Trail is an 87 km Grade 1–2 ride across Northland, from Ōpua in the Bay of Islands to Hōreke on the Hokianga Harbour. In September 2026 the Government announced $1 million for a new trail section near Ōpua. Explera DMC New Zealand plans the ride, bikes, transfers and rooms.
This guide is for travellers planning a cycling trip in the north of New Zealand, and for the travel agents and companies that book them. The trail trust describes it as the only one of New Zealand's 23 Great Rides that crosses the country from coast to coast.
What is the Twin Coast Cycle Trail?
- The trail. 87 km from Ōpua on the east coast to Hōreke on the west coast, through Kawakawa, Kaikohe and Ōkaihau.
- The grade. Grade 1–2, which the trail trust describes as easy and suitable for standard bikes and e-bikes.
- The time. About two days for the full trail. Shorter rides on single sections suit families and first-time riders.
- A Great Ride. It is part of Ngā Haerenga, the New Zealand Cycle Trail network of Great Rides, and the northernmost of them.
What are the four sections?
- Ōpua to Kawakawa (11 km). Native bush and wetlands to Whangae Tunnel Station, then a heritage train through the Taumārere Valley into Kawakawa, the town of the Hundertwasser public toilets.
- Kawakawa to Kaikohe (34 km). The longest section, through farmland and native bush, crossing the historic Twin Truss Bridges. Kaikohe is the trail's central town.
- Kaikohe to Ōkaihau (13 km). Farmland and volcanic country, with views of Lake Ōmāpere, which the trust describes as Northland's largest lake.
- Ōkaihau to Hōreke (28 km). A switchback, the longest boardwalk on any Great Ride, and the finish at the Māngungu Mission House on the Hokianga Harbour. There are no shops after Ōkaihau, so riders should carry food and water.

How does the train section work?
Between the Whangae Tunnel and Kawakawa, riders and their bikes travel on the Bay of Islands Vintage Railway. The trail trust lists two options: a 4 km train ride to Taumārere Station and a 4 km ride into Kawakawa, or an 8 km train ride to Kawakawa Station. A public gravel road is an alternative for experienced adult riders, but it is not part of the trail. Check the train timetable and book with the railway before the ride day.
What is the new funding for?
On 14 September 2026, Tourism and Hospitality Minister Louise Upston announced $1 million from the International Visitor Conservation and Tourism Levy for the trail. The money is for better visitor facilities and new cultural and tourism experiences. It will help build the first stage of a new cycle trail between Ōpua and the Whangae Tunnel, which gives riders an alternative route as the vintage railway is reinstated. The release said construction is expected to begin this financial year, once the final design is agreed. Until then, the train section stays part of the ride.

How do travellers plan the ride?
- Getting there. The trail trust names Auckland, Whangārei and Kerikeri as the main gateways. Domestic flights from Auckland take about 50 minutes to Kerikeri and about 40–45 minutes to Whangārei.
- Which direction. Starting at Ōpua puts the train section on day one and ends the trip at the Hokianga Harbour, close to Waipoua Forest and the Hokianga.
- Trail status. Sections can close for repairs or weather. The trail trust posts the status of each section on its website; check it in the week of the ride.
- Adding days. The ride fits after a stay in the Bay of Islands. Our Bay of Islands extension guide and Tāne Mahuta guide cover the rest of the north.
How Explera DMC New Zealand can help
We plan cycling and rail trail trips for travel agents, companies and travellers who enquire directly: bike and e-bike hire, the train booking, coach and private transfers at each end, luggage moves and rooms along the route. For riders who want a longer trip, our Otago Central Rail Trail guide covers a South Island Great Ride. Quotes are prepared to your dates and group size.
FAQ
How long is the Twin Coast Cycle Trail? It is 87 km, from Ōpua in the Bay of Islands to Hōreke on the Hokianga Harbour. Most riders take about two days.
Is the Twin Coast Cycle Trail suitable for beginners? It is graded 1–2, which the trail trust describes as easy, and it can be ridden on a standard bike or an e-bike.
Why is there a train on the Twin Coast Cycle Trail? Between the Whangae Tunnel and Kawakawa, riders travel on the Bay of Islands Vintage Railway. Check the timetable and book before the ride day.
What is the $1 million for? Announced on 14 September 2026, it is for visitor facilities, new cultural and tourism experiences, and the first stage of a new cycle trail between Ōpua and the Whangae Tunnel.
Where do riders fly to for the trail? Kerikeri and Whangārei, both about 40–50 minutes from Auckland by domestic flight, or riders can drive north from Auckland.
Sources
- Pou Herenga Tai – Twin Coast Cycle Trail, official trail website (trail sections, trail status, getting here)
- $1 million to enhance Northland cycle trail, Inside Government NZ, 14 September 2026
- Northland cycle trail receives funding boost, MBIE
Talk to the trade desk
Explera DMC New Zealand trade desk — b2b@explera.co.nz, WhatsApp +66 93 656 8090, B2B portal b2b.expleradmc.com.


